Israel - Time Needed to Deal with Construction Permits
Since 2015, Israel Time Needed to Deal with Construction Permits showed no change. In 2020, the country was ranked number 22 among other countries in Time Needed to Deal with Construction Permits at 975 Days. Israel is overtaken by Argentina, which was number 21 at 995 Days and is followed by Philippines at 962 Days. Guinea-Bissau topped the ranking with 1,785 Days in 2020, that is stable compared to 2019. Suriname, Greece and Afghanistan respectively ranked number 2, 3 and 4 in this ranking. Turkey witnessed the best average annual growth at +6.8% per year, while Niger recorded the worst performance at -7% per year.
Loading...
Date | Days |
---|---|
2020 | 975.00 |
2019 | 975.00 |
2018 | 975.00 |
2017 | 975.00 |
2016 | 975.00 |
Download all data from 2004 to 2020
How does Israel rank in Time Needed to Deal with Construction Permits?
# | 187 Countries | Days | Last | YoY | 5‑years CAGR | ||
---|---|---|---|---|---|---|---|
1 |
#1
Guinea-Bissau
|
1,785.00 | 2020 | +0.0 % | +0.0 % | View data | |
2 |
#2
Suriname
|
1,715.00 | 2020 | +0.0 % | +0.0 % | View data | |
21 |
#21
Argentina
|
995.00 | 2020 | +0.0 % | +0.0 % | View data | |
22 |
#22
Israel
|
975.00 | 2020 | +0.0 % | +0.0 % | View data | |
23 |
#23
Philippines
|
962.00 | 2020 | +0.0 % | +0.0 % | View data |