Argentina - Time Needed to Deal with Construction Permits
Since 2015, Argentina Time Needed to Deal with Construction Permits showed no change. In 2020, the country was number 21 among other countries in Time Needed to Deal with Construction Permits at 995 Days. Argentina is overtaken by Egypt, which was number 20 at 1,010 Days and is followed by Israel at 975 Days. Guinea-Bissau ranked the highest with 1,785 Days in 2020, stable compared to 2019. Suriname, Greece and Afghanistan respectively ranked number 2, 3 and 4 in this ranking. Turkey witnessed the best average annual growth at +6.8% per year, while Niger witnessed the worst performance at -7% per year.
Loading...
Date | Days |
---|---|
2020 | 995.00 |
2019 | 995.00 |
2018 | 995.00 |
2017 | 995.00 |
2016 | 995.00 |
Download all data from 2004 to 2020
How does Argentina rank in Time Needed to Deal with Construction Permits?
# | 187 Countries | Days | Last | YoY | 5‑years CAGR | ||
---|---|---|---|---|---|---|---|
1 |
#1
Guinea-Bissau
|
1,785.00 | 2020 | +0.0 % | +0.0 % | View data | |
2 |
#2
Suriname
|
1,715.00 | 2020 | +0.0 % | +0.0 % | View data | |
20 |
#20
Egypt
|
1,010.00 | 2020 | +0.0 % | +0.0 % | View data | |
21 |
#21
Argentina
|
995.00 | 2020 | +0.0 % | +0.0 % | View data | |
22 |
#22
Israel
|
975.00 | 2020 | +0.0 % | +0.0 % | View data |