Time Needed to Deal with Construction Permits

This key economic indicator for the Construction sector has been recently updated.

  1. Guinea-Bissau Time Needed to Deal with Construction Permits remained stable in 2020, compared to the previous year.
  2. Since 2015 Greece Time Needed to Deal with Construction Permits jumped by 1.6% year on year close to 1,711 Days.
  3. In 2020 Suriname was ranked number 2 in Time Needed to Deal with Construction Permits.
  4. In 2020 Turkey was ranked number 72 in Time Needed to Deal with Construction Permits at 623 Days, moving from 79 in 2019.

Top Countries in Time Needed to Deal with Construction Permits

Source: World Bank