Equatorial Guinea - Time Needed to Deal with Construction Permits
Since 2015, Equatorial Guinea Time Needed to Deal with Construction Permits remained stable. In 2020, the country was ranked number 141 among other countries in Time Needed to Deal with Construction Permits at 475 Days. Equatorial Guinea is overtaken by Antigua and Barbuda, which was ranked number 140 with 476 Days and is followed by Latvia with 469 Days. Guinea-Bissau lead the ranking with 1,785 Days in 2020, that is stable compared to 2019. Suriname, Greece and Afghanistan respectively ranked number 2, 3 and 4 in this ranking. Turkey witnessed the best average annual growth at +6.8% per year, while Niger was the worst growing country at -7% per year.
Loading...
Date | Days |
---|---|
2020 | 475.00 |
2019 | 475.00 |
2018 | 475.00 |
2017 | 475.00 |
2016 | 475.00 |
Download all data from 2006 to 2020
How does Equatorial Guinea rank in Time Needed to Deal with Construction Permits?
# | 187 Countries | Days | Last | YoY | 5‑years CAGR | ||
---|---|---|---|---|---|---|---|
1 |
#1
Guinea-Bissau
|
1,785.00 | 2020 | +0.0 % | +0.0 % | View data | |
2 |
#2
Suriname
|
1,715.00 | 2020 | +0.0 % | +0.0 % | View data | |
140 |
#140
Antigua and Barbuda
|
476.00 | 2020 | +0.0 % | +0.0 % | View data | |
141 |
#141
Equatorial Guinea
|
475.00 | 2020 | +0.0 % | +0.0 % | View data | |
142 |
#142
Latvia
|
469.00 | 2020 | +0.0 % | +0.0 % | View data |